Woonsocket, RI
401-233-ROOF

Roofing · Woonsocket & Northern RI

A full roof replacement, torn off and back on in a single day

Tim measures the roof himself and writes the price. The crew strips to the deck, replaces any rot, dries it in and shingles it the same day.

Chapter 01

When a Northern Rhode Island roof is actually done

A roof that's due for full replacement usually shows more than one sign at once: three-tab shingles cupping and losing granules across a whole slope, soft spots underfoot near valleys or the chimney, and daylight or water staining showing up in the attic after a hard rain or a heavy wet snow.

Freeze-thaw cycles and ice damming at the eaves are what push a Rhode Island roof from patchable to done. Water that backs up under the shingle line every winter eventually finds its way into the decking, and once the deck is compromised, a repair is just delaying a bigger job.

Tim walks the whole roof and checks what he can see of the deck from the attic before he ever quotes a replacement. If a roof still has real life left, he says so and prices a repair instead. There's no salesman pushing a full tear-off on a roof that doesn't need one.

A large colonial home mid-reroof with a full porch visible, ladder against the eave

A large colonial home mid-reroof with a full porch visible, ladder against the eave

The tear-off, in the order it actually happens

Tim measures the roof himself and hands the homeowner a written price before a crew is scheduled. No estimator, no call center, and the price on the page is the price on the invoice.

On job day the crew tarps the yard, landscaping and siding first, then strips the old roof down to bare decking. Every sheet gets inspected as it's exposed. Rotted or delaminated plywood is cut out and replaced right there, not shingled over.

With the deck sound, six feet of ice and water shield goes up from the eaves and into the valleys for real ice-dam protection, then synthetic underlayment across the whole field to dry the roof in. New step flashing goes in at every chimney and dormer before the architectural shingles go on, finished with a ridge vent so the attic can breathe.

Cleanup is a magnet sweep of the yard and driveway for nails and debris, the same day the roof goes on. Crews are typically on site early and the whole job, tear-off through cleanup, is done before dark.

Chapter 03

What the warranty covers once the crew is gone

Every roof replacement carries Tim's own 15-year labor warranty on top of the shingle manufacturer's material warranty. If the workmanship isn't right, Tim comes back and fixes it himself.

After a replacement, keep an eye on gutters for granule buildup in the first year, any new staining on ceilings after storms, and ice forming at the eaves in winter, since attic ventilation and insulation matter as much as the shingles themselves for keeping ice dams from forming again.

Tim's Roofing and Siding has replaced roofs across Woonsocket and Northern Rhode Island for 21 years, RI Reg. #25145. If the roof might only need a fix rather than a full tear-off, the

roof-repair page covers how that diagnosis works.

Real jobs: a Woonsocket colonial and a Smithfield cape both went from full tear-off to finished shingle roof in one day. See both below.

From a real job sheet

Full Architectural Shingle Roof Replacement

This Woonsocket colonial had a worn three-tab roof that was losing granules and cupping along the south slope. Tim came out himself, measured the roof and gave the homeowner a written price on the spot. No salesman, no pressure.

The crew tore off the old layer, inspected and replaced the damaged decking, then dried the roof in with ice-and-water shield along the eaves and valleys before the new architectural shingles went on.

See the full job →

Job sheet · Woonsocket, RI · June 2026

  1. 01Architectural asphalt shingles
  2. 02Ice & water shield
  3. 03Synthetic underlayment
  4. 04Ridge vent
Smithfield cape mid-install, ladder up and new shingles going on
Roof Replacement in Smithfield, Smithfield, RI (August 2026). This Smithfield home needed a full tear-off. The old shingles were at the end of their life and the roof was due before winter. See the finished roof →